Decision and current permit

The New Bridgewater Bridge major project permit (MPP2201) was granted on 18 May 2022.

The decision: Decision and final assessment report 18 May 2022 (PDF, 1.5 MB)

The current New Bridgewater Bridge major project permit, incorporating any approved amendments Permit - MPP2201 - 18 May 2022 (PDF, 1.2 MB)

Approved plans and reports

Any current plans or reports that satisfy Commission managed permit conditions will be listed here.

Show information about: Condition 4 - Design plans

Summary of endorsementDocument
Updated northern land reclamation – endorsed 3 March 2023MPP2201 -  updated Northern Land Reclamation, 3 February 2023 (PDF, 693.8 KB)
Design plans (excluding reclamation) – endorsed 26 September 2022MPP2201 -  Project Design Plan Report (revision C), 16 September 2022 (PDF, 38.9 MB)
Reclamation only - endorsed 12 September 2022MPP2201 - Reclamation Design Plans, 31 August 2022 (PDF, 12.2 MB)

Show information about: Condition 35 - Construction environmental management plan

Summary of endorsementDocument
Updated northern land reclamation - Endorsed 3 March 2023See document in condition 4 above
Relevant sections - Endorsed 30 September 2022MPP2201 - Appendix 8 - Summary of Construction Methodologies of DCEMP (revision F), 28 September 2022 (PDF, 2.5 MB)
Seabed disturbance plan provided 26 September 2022 - no endorsement requiredMPP2201 - Seabed Disturbance Plan referenced in DCEMP provided 26 September 2022 (PDF, 4.9 MB)

Show information about: Condition 42 - Geodiversity management study

Summary of endorsementDocument
Pre-construction study provided 16 September 2022 – no endorsement requiredMPP2201 - Geodiversity Values Study, 25 August 2022 (PDF, 2.5 MB)
Post construction study - not yet provided

Show information about: Condition 44 - Landscape plan

Summary of endorsementDocument
Not yet endorsed

Show information about: Condition 46 - Lighting design plan

Summary of endorsementDocument
Not yet endorsed