Current status - last updated 28/10/2025 :Exhibition

Overview

The North West Transmission Upgrades Major Infrastructure Project (the major infrastructure project) proposes the use and development of a 220kV overhead electricity transmission line and towers from Palmerston to Sheffield, Sheffield to Burnie via a spur line to Heybridge, Burnie to East Cam, East Cam to Hampshire, and Hampshire to Staverton. Substations at Hampshire and Staverton are also proposed, along with ancillary facilities at multiple locations.

This is the second stage of the major infrastructure project process under the Major Infrastructure Development Approvals Act 1999 (the MIDA Act), where the proponent submits an application for a permit under the Land Use Planning and Approvals Act 1993 (the LUPA Act).

The proponent’s application is for the section of the major infrastructure project from Palmerston to Hampshire. The application is assessed by the Development Assessment Panel (the Panel) against the planning criteria. The Panel publicly exhibits the application and invites representations. The Panel has a discretion to grant or refuse to grant a permit for the application under section 57 of the LUPA Act. Public hearings do not form part of this process. The applicant and representors may appeal to the Appeal Tribunal.

See North West Transmission Upgrades Project - planning criteria for the first stage of the process.

Received

This application is for the section of the major infrastructure project from Palmerston to Sheffield, Sheffield to Burnie via a spur line to Heybridge, Burnie to East Cam, East Cam to Hampshire, and includes the substation at Hampshire as well as associated ancillary facilities.

The Panel is required to assess the application in accordance with section 57 of the LUPA Act.

The Panel will first determine if any additional information is required to assess the application against the planning criteria. Once all additional information is submitted by the proponent to the satisfaction of the Panel, the application will proceed to exhibition.

The proponent’s application documentation and additional information are provided below.

17/04/2025

Commission receives application for a permit

Tasmanian Networks Pty Ltd (TasNetworks)  has made an application for a permit under section 57 of the LUPA Act.

Exhibition

Representations can be made to the Commission until 18 October 2025 by email to tpc@planning.tas.gov.au or post to Tasmanian Planning Commission, GPO Box 1691, Hobart 7001

20/09/2025 - 18/10/2025

Exhibition of application for a permit

The application is on exhibition during this period. All exhibition documents are available below.

Public notice 20 September 2025 PDF, 297.6 KB

The number of representations received during this exhibition: 28

Exhibition documents

Application - Table of contents 16/09/2025 PDF, 1.8 MB Part A - Report introduction 16/09/2025 PDF, 48.5 MB Part B - Planning report 17/09/2025 PDF, 59.9 MB Part C - Ch 0 - Executive summary 16/09/2025 PDF, 999.1 KB Part C - Chapter 1 - Introduction 17/09/2025 PDF, 3.1 MB Part C - Chapter 2 - Project rationale and alternatives 17/09/2025 PDF, 33.4 MB Part C - Chapter 3 - Public consultation 17/09/2025 PDF, 1.4 MB Part C - Chapter 4 - Impact assessment framework 17/09/2025 PDF, 1.3 MB Part C - Chapter 5 - Existing environment 17/09/2025 PDF, 22.9 MB Part C - Chapter 6 - Potential impacts and their management 17/09/2025 PDF, 59.0 MB Part C - Chapter 7 - Cumulative and interactive impacts 17/09/2025 PDF, 3.3 MB Part C - Chapter 8 - Decommissioning and rehabilitation 17/09/2025 PDF, 1.0 MB Part C - Chapter 9 - Environmental management, monitoring and review 17/09/2025 PDF, 5.2 MB Part C - Chapter 10 - Matters of national environmental significance 17/09/2025 PDF, 18.8 MB Part C - Chapter 11 - Conclusion 17/09/2025 PDF, 1.3 MB Part C - Chapter 12 - References 17/09/2025 PDF, 908.1 KB Part D - Report conclusions 17/09/2025 PDF, 1.1 MB Part E - Appendix A - Vegetation clearance 17/09/2025 PDF, 1.4 MB Part-E-Appendix-A-Vegetation-clearance-Excel-spreadsheet.xlsx 18/09/2025 EXCEL, 397.5 KB Part E - Appendix B - Ecology assessment report (Part 1.1) 18/09/2025 PDF, 18.9 MB Part E - Appendix B - Ecology assessment report (Part 1.2) 18/09/2025 PDF, 64.4 MB Part E - Appendix B - Ecology assessment report (Part 1.3) 18/09/2025 PDF, 137.3 MB Part E - Appendix C - Noise and Vibration Assessment Report 17/09/2025 PDF, 55.6 MB Part E - Appendix D - Air quality impact assessment 17/09/2025 PDF, 6.8 MB Part E - Appendix E - Traffic and transport assessment report 17/09/2025 PDF, 20.1 MB Part E - Appendix F - Agriculture and forestry assessment report 17/09/2025 PDF, 6.3 MB Part E - Appendix G - Landslide risk assessment report (Part 1) 17/09/2025 PDF, 5.5 MB Part E - Appendix G - Landslide risk assessment report (Part 2.1) 18/09/2025 PDF, 130.0 MB Part E - Appendix G - Landslide risk assessment report (Part 2.2) 18/09/2025 PDF, 37.8 MB Part E - Appendix H - Geomorphology and geology assessment report 17/09/2025 PDF, 19.5 MB Part E - Appendix I - Surface water and flooding assessment reports (Part 1) 17/09/2025 PDF, 96.9 MB Part E - Appendix I - Surface water and flooding assessment reports (Parts 2 & 3) 17/09/2025 PDF, 111.6 MB Part E - Appendix J - Coastal inundation and erosion assessment report 17/09/2025 PDF, 8.8 MB Part E - Appendix K - Landscape and visual impact assessment report 17/09/2025 PDF, 123.0 MB Part E - Appendix K - Landscape and visual impact assessment report (residential addendum) 17/09/2025 PDF, 123.0 MB Part E - Appendix L - Stakeholder engagement reports 17/09/2025 PDF, 24.4 MB Part E - Appendix M - Socioeconomic assessment report 17/09/2025 PDF, 7.3 MB Part E - Appendix N - Cultural heritage summary report 17/09/2025 PDF, 3.4 MB Part E - Appendix O - Climate change assessment report 17/09/2025 PDF, 5.5 MB Part E - Appendix P - Groundwater assessment report 17/09/2025 PDF, 88.4 MB Part E - Appendix Q - Contaminated land and acid sulfate soils assessment report (Part 1) 17/09/2025 PDF, 2.0 MB Part E - Appendix Q - Contaminated land and acid sulfate soils assessment report (Part 2) 17/09/2025 PDF, 138.7 MB Part E - Appendix R - EMF, AN and RFI assessment report 17/09/2025 PDF, 31.2 MB Part E - Appendix S - Greenhouse Gas Assessment report 17/09/2025 PDF, 1.8 MB Part E - Attachment 1 - MIDAA Order 17/09/2025 PDF, 975.9 KB Part E - Attachment 2 - Planning criteria 17/09/2025 PDF, 1.2 MB Part E - Attachment 3 - Application letter 17/09/2025 PDF, 334.5 KB Part E - Attachment 4 - Permissions and declaration 17/09/2025 PDF, 4.0 MB Part E - Attachment 5 - Notice of application and distribution list 17/09/2025 PDF, 1.0 MB Part E - Attachment 6 - Notified corridor list and titles list 17/09/2025 PDF, 659.6 KB Part-E-Attachment-6-Current-folio-of-the-Register-for-all-land-to-which-the-permit-sought-to-relateschedule-of-easements-Excel-spreadsheet.xlsx 19/09/2025 EXCEL, 116.1 KB Part E - Attachment 7 - Planning criteria cross check 17/09/2025 PDF, 1.4 MB Part E - Attachment 8 - Proposed Plans (Part 1.1) 18/09/2025 PDF, 123.2 MB Part E - Attachment 8 - Proposed Plans (Part 1.2) 18/09/2025 PDF, 143.9 MB Part E - Attachment 9 - Map Series (Part 1.1) 18/09/2025 PDF, 90.0 MB Part E - Attachment 9 - Map Series (Part 1.2) 18/09/2025 PDF, 103.2 MB Part E - Attachment 10 - Management measures 17/09/2025 PDF, 1.1 MB Part E - Attachment 11 - Route selection report 17/09/2025 PDF, 33.1 MB Part E - Attachment 12 - Change management procedure 17/09/2025 PDF, 1.5 MB

Representations

Representation 1 - Terence Chandler 22 September 2025 08/10/2025 PDF, 455.5 KB Representation 2 - Kim Philips-Haines 27 September 2025 08/10/2025 PDF, 2.7 MB Representation 3 - Bill Kaine 27 Septmber 2025 08/10/2025 PDF, 136.3 KB Representation 4 - Dr Simon Locke 4 October 2025 07/10/2025 PDF, 55.3 KB Representation 5 - Adam Waasdorp 6 October 2025 07/10/2025 PDF, 77.7 KB Representation 6 - Hon Sue Smith AM 6 October 2025 07/10/2025 PDF, 75.8 KB Representation 7 - Solve Tasmania 13 October 2025 15/10/2025 PDF, 449.6 KB Representation 8 - Helan Green 13 October 2025 15/10/2025 PDF, 914.6 KB Representation 9 - Dee and Scott Lowry 14 October 2025 15/10/2025 PDF, 322.4 KB Representation 10 - Tasmanian Beekeepers Association 15 October 2025 16/10/2025 PDF, 134.0 KB Representation 11 - Wayne and Debbie Connelly 15 October 2025 16/10/2025 PDF, 229.3 KB Representation 12 - Johan Nathalie and Yuri Wolfert 16 October 2025 17/10/2025 PDF, 265.1 KB Representation 13 - TasFarmers 16 October 2025 20/10/2025 PDF, 198.4 KB Representation 14 - Carol-Ann Fletcher 16 October 2025 17/10/2025 PDF, 21.9 MB Representation 15 - Department of Natural Resources and Environment Tasmania - 17 October 2025 22/10/2025 PDF, 3.8 MB Representation 16 - TasNetworks - 17 October 2025 22/10/2025 PDF, 5.1 MB Representation 17 - DG & WN Pty Ltd - 17 October 2025 24/10/2025 PDF, 3.2 MB Representation 18 - Ross Lamplugh - 17 October 2025 22/10/2025 PDF, 153.8 KB Representation 19 - Mila Gunko - 17 October 2025 22/10/2025 PDF, 467.9 KB Representation 20 - Dannielle Denning - 17 October 2025 22/10/2025 PDF, 368.9 KB Representation 21 - Bob Brown Foundation - 17 October 2025 22/10/2025 PDF, 398.0 KB Representation 22 - Andrew Charles Ricketts - 18 October 2025 22/10/2025 PDF, 85.6 KB Representation 23 - Adam Moller - 18 October 2025 22/10/2025 PDF, 107.5 KB Representation 24 - Save Our Eagles Tasmania - 18 October 2025 22/10/2025 PDF, 95.2 KB Representation 25 - Stephen Allen - 18 October 2025 22/10/2025 PDF, 174.0 KB Representation 26 - Cradle Coast Authority - 18 October 2025 22/10/2025 PDF, 273.1 KB Representation 27 - Sue Abbott - 18 October 2025 22/10/2025 PDF, 760.0 KB Representation 28 - Lutruwita Country Care Network - 18 October 2025 22/10/2025 PDF, 395.7 KB

Decision