| Summary of endorsement | Document |
|---|---|
| Pre-construction study provided 16 September 2022 – no endorsement required | MPP2201 - Geodiversity Values Study, 25 August 2022 (PDF, 2.5 MB) |
| Post construction study provided 7 May 2026 - no endorsement required | MPP2201- Geodiversity Values Addendum Study, 7 May 2026 (PDF, 7.2 MB) |
