Overview

The  project of State significance proposes a multipurpose stadium at Macquarie Point (the project).

The project is subject to an integrated assessment process under the State Policies and Projects Act 1993 (the Act) and the requirements of the Ministerial Direction issued under the Act.

This is the second stage of the process, where the Commission prepares an integrated assessment report with recommendations to the Minister.

See Macquarie Point Multipurpose Stadium Guidelines for information about the first stage of the process.

Received

The Commission has received the proponent’s reports in response to the Guidelines, submitted on 17 September 2024. The Commission has now commenced the integrated assessment of the project.

The Commission must prepare its integrated assessment report within 12 months of the submission date, or such later day as the Minister may direct in writing.

The proponent’s reports are provided for information below.

The Commission is required to consult with Hobart City Council and identified agencies with an interest in the project in relation to the preparation of the draft integrated assessment report.

The Panel has determined the agencies considered to have an interest in the project. See the list of agencies (PDF, 76.3 KB).

The overall assessment process is summarised in a flowchart (PDF, 181.6 KB).

Proponent’s further information reports - 31 January 2025

Macquarie Point Development Corporation further information request response letter 31 January 2025 06/08/2026 PDF, 221.9 KB Annexure A - Macquarie Point Development Corporation request for further information response table 31 January 2025 (SUPERSEDED by Annexure A dated 17 February 2025) 06/08/2026 PDF, 305.3 KB Annexure B - Consolidated plans 31 January 2025 (SUPERSEDED by Annexure B dated 17 February 2025) 06/08/2026 PDF, 56.4 MB Annexure B - Consolidated plans 2 31 January 2025 (SUPERSEDED by Annexure B dated 17 February 2025) 06/08/2026 PDF, 23.5 MB Annexure C - BMG supporting statement detailed design stage plans 29 January 2025 06/08/2026 PDF, 68.4 KB Annexure D - Jensen Hughes supporting statement concept design 31 January 2025 06/08/2026 PDF, 80.6 KB Annexure E - Zancon supporting statement detailed design stage plans 28 January 2025 06/08/2026 PDF, 680.5 KB Annexure G - Macquarie Point Development Corporation economic societal costs and benefits 31 January 2025 06/08/2026 PDF, 277.3 KB Annexure H - KPMG Economics Analysis Report 31 January 2025 06/08/2026 PDF, 2.2 MB Annexure I - Wolferstan Verney and Partners Pty Ltd Economics Analysis Report cost estimates 31 January 2025 06/08/2026 PDF, 255.1 KB Annexure J - Macquarie Point Development Corporation Draft Precinct Plan Consultation Summary 31 January 2025 06/08/2026 PDF, 275.6 KB Annexure K - SLR Consulting visualisations 31 January 2025 06/08/2026 PDF, 4.3 MB Annexure L - SLR Consulting clarification regarding visualisation 31 January 2025 06/08/2026 PDF, 128.7 KB Annexure M - Macquaire Point Development Corporation Aboriginal community consultation 31 January 2025 06/08/2026 PDF, 919.0 KB Annexure N - Tasmanian Aboriginal community engagement and Aboriginal Culturally Informed Zone and Stadium August 2024 06/08/2026 PDF, 8.9 MB Annexure O - Southern Archaeology Aboriginal Heritage Assessment Report 30 January 2025 06/08/2026 PDF, 44.8 MB Annexure P - WSP transport and movement matters 31 January 2025 06/08/2026 PDF, 460.1 KB Annexure Q - AECOM Australia Noise Assessment supplementary report 31 January 2025 06/08/2026 PDF, 54.7 MB Annexure R - Introba Lighting Assessment 31 January 2025 06/08/2026 PDF, 82.9 KB Annexure S - AECOM Australia environmental condition of the site 31 January 2025 06/08/2026 PDF, 329.9 KB Annexure T - BMT stormwater management 31 January 2025 06/08/2026 PDF, 136.3 KB Annexure U - Tetra Tech Coffey Environmental Auditor opinion 30 January 2025 06/08/2026 PDF, 382.8 KB Annexure V - Macquarie Point Development Corporation emergency management and incident response January 2025 06/08/2026 PDF, 10.0 MB Annexure W - Subdivision plan 31 January 2025 06/08/2026 PDF, 66.0 KB Annexure X - SBP statement regarding the roof structure 20 December 2024 06/08/2026 PDF, 637.1 KB Annexure Y - Summary on opportunity for commercial tenancies 31 January 2025 06/08/2026 PDF, 63.8 KB Annexure Z - Key components cost spreadsheet 31 January 2025 06/08/2026 PDF, 158.0 KB

Proponent's reports

Macquarie Point Multipurpose Stadium Summary Report September 2024 06/08/2026 PDF, 42.0 MB Appendix A - Architectural Drawings MPS-COX-DR-01-A00-0000_P1 (SUPERSEDED by Annexure A dated 17 February 2025) 06/08/2026 PDF, 2.3 MB Appendix A - Architectural Drawings MPS-COX-DR-01-A11-0000_P1 (SUPERSEDED by Annexure A dated 17 February 2025) 06/08/2026 PDF, 7.4 MB Appendix A - Architectural Drawings MPS-COX-DR-01-A11-1000_P1 (SUPERSEDED by Annexure A dated 17 February 2025) 06/08/2026 PDF, 2.4 MB Appendix A - Architectural Drawings MPS-COX-DR-01-A15-1000_P1 (SUPERSEDED by Annexure A dated 17 February 2025) 06/08/2026 PDF, 686.2 KB Appendix A - Architectural Drawings MPS-COX-DR-01-A20-0000_P1 (SUPERSEDED by Annexure A dated 17 February 2025) 06/08/2026 PDF, 6.8 MB Appendix A - Architectural Drawings MPS-COX-DR-01-A20-0010_P1 (SUPERSEDED by Annexure A dated 17 February 2025) 06/08/2026 PDF, 3.5 MB Appendix A - Architectural Drawings MPS-COX-DR-01-A20-0020_P1 (SUPERSEDED by Annexure A dated 17 February 2025) 06/08/2026 PDF, 3.8 MB Appendix A - Architectural Drawings MPS-COX-DR-01-A20-0021_P1 (SUPERSEDED by Annexure A dated 17 February 2025) 06/08/2026 PDF, 1.2 MB Appendix A - Architectural Drawings MPS-COX-DR-01-A20-0030_P1 (SUPERSEDED by Annexure A dated 17 February 2025) 06/08/2026 PDF, 2.3 MB Appendix A - Architectural Drawings MPS-COX-DR-01-A20-0040_P1 (SUPERSEDED by Annexure A dated 17 February 2025) 06/08/2026 PDF, 2.4 MB Appendix A - Architectural Drawings MPS-COX-DR-01-A20-0050_P1 (SUPERSEDED by Annexure A dated 17 February 2025) 06/08/2026 PDF, 4.8 MB Appendix A - Architectural Drawings MPS-COX-DR-01-A20-0100_P1 (SUPERSEDED by Annexure A dated 17 February 2025) 06/08/2026 PDF, 1.2 MB Appendix A - Architectural Drawings MPS-COX-DR-01-A30-0010_P1 (SUPERSEDED by Annexure A dated 17 February 2025) 06/08/2026 PDF, 5.7 MB Appendix A - Architectural Drawings MPS-COX-DR-01-A30-0020_P1 (SUPERSEDED by Annexure A dated 17 February 2025) 06/08/2026 PDF, 514.8 KB Appendix A - Architectural Drawings MPS-COX-DR-01-A40-0000_P1 (SUPERSEDED by Annexure A dated 17 February 2025) 06/08/2026 PDF, 3.4 MB Appendix A - Architectural Drawings MPS-COX-DR-01-A80-0000_P1 (SUPERSEDED by Annexure A dated 17 February 2025) 06/08/2026 PDF, 7.3 MB Appendix AA - Construction Management Plan - ZANCON August 2024 06/08/2026 PDF, 3.3 MB Appendix B - Stadium Design Description - COX+Cumulus August 2024 06/08/2026 PDF, 55.4 MB Appendix B - Stadium Design Description 2 - COX+Cumulus August 2024 06/08/2026 PDF, 30.5 MB Appendix BB - Services Report - Infrastructure Strategy - JMG August 2024 06/08/2026 PDF, 24.6 MB Appendix C - Housing for Workforce - LeftField Project Solutions 06/08/2026 PDF, 284.1 KB Appendix CC - Emergency Management and Incident Response - Intelligent Risks Pty Ltd August 2024 06/08/2026 PDF, 5.0 MB Appendix D - Cut and Fill - WSP 7 August 2024 06/08/2026 PDF, 18.1 MB Appendix DD - Title folio plans and easements relating to project site 24 July 2024 06/08/2026 PDF, 1.6 MB Appendix E - Cost Benefit Analysis - KPMG 5 September 2024 06/08/2026 PDF, 2.2 MB Appendix EE - Car Parking & Access Review - SALT 4 September 2024 06/08/2026 PDF, 4.0 MB Appendix F - Economic Impact Assessment - KPMG 5 September 2024 06/08/2026 PDF, 2.1 MB Appendix FF - Conceptual Hydrogeological Model and Numerical Model Memo - Hydro Earth Consulting 17 July 2024 06/08/2026 PDF, 37.0 MB Appendix G - Financial Impact Report - KPMG 9 September 2024 06/08/2026 PDF, 1.1 MB Appendix GG - Site Development Plan - Brian Risby April 2024 06/08/2026 PDF, 8.4 MB Appendix H - Social and Cultural Analysis Report - KPGM 9 September 2024 06/08/2026 PDF, 2.5 MB Appendix HH - Pre-Stadium Cultural and Landscape Values Assessment - Southern Archaeological 28 August 2024 06/08/2026 PDF, 20.2 MB Appendix I - Urban Design Framework August 2024 06/08/2026 PDF, 22.9 MB Appendix II - Geotechnical Factual Report - WSP June 2024 06/08/2026 PDF, 30.1 MB Appendix J - Visual Impact Assessment Report - SLR Consulting 30 August 2024 06/08/2026 PDF, 14.4 MB Appendix JJ - Mac Point Precinct Plan - Macquarie Point Development Corporation August 2024 06/08/2026 PDF, 43.8 MB Appendix K - Previous Aboriginal Heritage Investigations - 17 July 2024 06/08/2026 PDF, 21.8 MB Appendix KK - Preliminary Results of Acid Sulphate Investigation - AECOM 2 August 2024 06/08/2026 PDF, 147.3 KB Appendix L - Historic Cultural Heritage Impact Assessment - Purcell and GJM Heritage August 2024 06/08/2026 PDF, 37.9 MB Appendix LL - Site Environment Management Plan - AECOM 22 October 2021 06/08/2026 PDF, 4.6 MB Appendix M - Historical Archaeological Assessment, Sensitivity Report and Method Statement - Aboriginal Heritage Investigations 20 August 2024 06/08/2026 PDF, 10.7 MB Appendix MM - AFL Licence Taskforce Business Plan 2019 - 18 December 2019 06/08/2026 PDF, 22.2 MB Appendix N - Transport Study - WSP August 2024 06/08/2026 PDF, 29.6 MB Appendix NN - Public Art Strategy Discussion Paper - Inkhorn Projects September 2024 06/08/2026 PDF, 552.2 KB Appendix O - Wind Comfort Assessment for Visitors and the Precinct Area - Wacker Ingenieure 21 August 2024 06/08/2026 PDF, 2.1 MB Appendix P - Lighting Assessment and Electrical & Hydraulic Infrastructure - Introba 4 September 2024 06/08/2026 PDF, 6.8 MB Appendix Q - Noise and Vibration Assessment - AECOM 21 August 2024 06/08/2026 PDF, 4.5 MB Appendix R - Natural Values Assessment - North Barker 27 August 2024 06/08/2026 PDF, 11.3 MB Appendix S - Stormwater Management Plan - BMT 26 August 2024 06/08/2026 PDF, 6.5 MB Appendix T - Solid Waste and Hazardous Material Management - Incognitus August 2024 06/08/2026 PDF, 10.0 MB Appendix U - Coastal Inundation Assessment - BMT 23 August 2024 06/08/2026 PDF, 6.8 MB Appendix V - Site Remediation Strategy Update 2024 - AECOM 17 June 2024 06/08/2026 PDF, 3.2 MB Appendix W - Overland Flood Assessment - BMT 23 August 2024 06/08/2026 PDF, 4.9 MB Appendix X - Geotechnical Interpretive Report - WSP July 2024 06/08/2026 PDF, 47.7 MB Appendix Y - Heat Risk and Climate Change Assessment - BMT 31 May 2024 06/08/2026 PDF, 9.0 MB Appendix Z - Signs - Futago 27 August 2024 06/08/2026 PDF, 6.2 MB

Stakeholder communications

Commission email to Department of Premier and Cabinet requesting additional cost information for stadium 2 July 2025 06/08/2026 PDF, 232.9 KB Commission email to Department of Premier and Cabinet - response to Technical Note 1 27 June 2025 06/08/2026 PDF, 981.9 KB Email and document from Department of Premier and Cabinet responding to Commission email regarding updated capital cost estimates - Technical Note Number 1 - 25 June 2025 06/08/2026 PDF, 1.2 MB Commission email to Department of Premier and Cabinet with updated capital cost estimates 24 June 2025 06/08/2026 PDF, 141.3 KB Letter from MinterEllison providing details of witnesses for hearing 17 June 2025 06/08/2026 PDF, 111.7 KB Letter from MinterEllison stating time needed to represent at the hearing 16 June 2025 06/08/2026 PDF, 129.8 KB Commission letter to MinterEllison responding to request to adjourn hearing 17 June 2025 06/08/2026 PDF, 1.9 MB Letter from MinterEllison requesting to adjourn hearing 13 June 2025 06/08/2026 PDF, 122.3 KB Commission email to Department of Premier and Cabinet - updated capital cost estimates 12 June 2025 06/08/2026 PDF, 183.6 KB Commission email to Department of Premier and Cabinet acknowledging receipt of draft enabling legislation 30 May 2025 06/08/2026 PDF, 1.0 MB Letter from Department of Premier and Cabinet providing draft enabling legislation 27 May 2025 06/08/2026 PDF, 28.1 MB Commission letter to Department of Premier and Cabinet 23 May 2025 06/08/2026 PDF, 1.1 MB Letter from Department of Premier and Cabinet 21 May 2025 06/08/2026 PDF, 233.7 KB Commission email to MinterEllison and Macquarie Point Development Corporation advising of publication of representations to website 16 May 2025 06/08/2026 PDF, 936.4 KB Commission email to MinterEllison and Macquarie Point Development Corporation providing update on representations 12 May 2025 06/08/2026 PDF, 689.3 KB Letter from Macquarie Point Development Corporation providing update on outstanding reports 7 May 2025 06/08/2026 PDF, 215.6 KB Commission email to Macquarie Point Development Corporation on outstanding reports 30 April 2025 06/08/2026 PDF, 936.9 KB Commission letter to MinterEllison on integrity of draft Intregrated Assessment Report 15 April 2025 06/08/2026 PDF, 131.3 KB Commission letter to MinterEllison responding to representation 8 April 2025 06/08/2026 PDF, 219.0 KB Representation MinterEllison for the Crown in Right of Tasmania 3 April 2025 06/08/2026 PDF, 187.9 KB Commission email to Macquarie Point Development Corporation advising indicative exhibition and hearings timeline 11 March 2025 06/08/2026 PDF, 1.0 MB Commission email to Macquarie Point Development Corporation requesting further information on 3D Model of Stadium Project 27 February 2025 06/08/2026 PDF, 936.1 KB Commission email to Macquarie Point Development Corporation Scope of Assessment 22 January 2025 06/08/2026 PDF, 1.3 MB Commission letter to Macquarie Point Development Corporation requesting further information 19 November 2024 06/08/2026 PDF, 1.3 MB Commission letter to relevant agencies 26 September 2024 06/08/2026 PDF, 832.4 KB Commission letter to Hobart City Council 25 September 2024 06/08/2026 PDF, 680.0 KB Commission email to Environment Protection Authority 2 August 2024 06/08/2026 PDF, 715.8 KB Commission email to Heritage Tasmania 2 August 2024 06/08/2026 PDF, 716.3 KB Commission email to Department of Treasury and Finance 23 July 2024 06/08/2026 PDF, 912.5 KB Commission email to Department of State Growth 23 July 2024 06/08/2026 PDF, 919.1 KB Commission email to Hobart City Council 23 July 2024 06/08/2026 PDF, 918.8 KB Commission letter to relevant agencies 11 April 2024 06/08/2026 PDF, 1.3 MB Commission letter to Macquarie Point Development Corporation (as a relevant agency) 11 April 2024 06/08/2026 PDF, 570.6 KB Commission letter to Hobart City Council 11 April 2024 06/08/2026 PDF, 313.2 KB Commission letter to Department of Premier and cabinet 11 April 2024 06/08/2026 PDF, 467.3 KB Commission letter to Department of Climate Change Energy the Environment and Water 11 April 2024 06/08/2026 PDF, 410.1 KB Commission letter to Macquarie Point Development Corporation on integrated assessment process 22 February 2024 06/08/2026 PDF, 753.2 KB

Exhibition

The exhibition and representation period have now closed.

Exhibition of the draft integrated assessment report (draft IAR) commences at 4pm on 31 March 2025.

Representations may be made to the Commission until 8 May 2025 via the representation form.

Written representations must be received no later than midnight on 8 May 2025. Late representations will not be accepted.

Representations may also be submitted by post to Tasmanian Planning Commission, GPO Box 1691, HOBART TAS 7001.

The draft IAR, submissions from Hobart City Council and relevant agencies, and the Proponent's reports are available to view and download.

The draft IAR, submissions and the Proponent’s reports may also be viewed in person at:

  • Tasmanian Planning Commission offices, Level 3, 144 Macquarie Street, Hobart (from 9am until 5pm, Monday to Friday)
  • Launceston Library, 71 Civic Square, Launceston (during opening hours)
  • Devonport Library, Paranaple Centre, 137 Rooke Street, Devonport (during opening hours)
  • Burnie Library, 30 Alexander Street, Burnie (during opening hours)

Further information is available in the FAQ's.

31 March 2025 - 08 May 2025

Exhibition of draft integrated assessment report under section 22 of the State Policies and Projects Act 1993

The draft IAR is on exhibition during this period. The draft IAR, submissions from Hobart City Council and relevant agencies, and a consolidated set of the Proponent’s plans for the Project are available below. The Proponent’s reports addressing a range of issues relating to the Project are available under ‘Received’ above.

Public notice 31 March 2025 PDF, 67.5 KB

Hearing

Please note the Commission will consider every representation but will not necessarily hold a hearing into every one. It is anticipated that a number of issues raised by some of the representations will be the subject of hearings.

10 June 2025 10:00am

Directions hearing

Merino Room, The Old Woolstore Hotel, 1 Macquarie Street, Hobart

Directions hearing summary 10 June 2025 PDF, 278.5 KB
25 June 2025 - 15 July 2025 09:30am

Hearing (multiple dates)

Merino Room, The Old Woolstore Hotel, 1 Macquarie Street, Hobart

25-27 June, 30 June, 1-3 July, 7-11 July and 15 July (commencing 9.30am)

Hearing Schedule current as at 11 July 2025 PDF, 208.4 KB

Hearing and further submissions

Submission MinterEllison response to SES submission 5 September 2025 06/08/2026 PDF, 58.4 MB Submission SES Stormwater Assessment Report 21 August 2025 06/08/2026 PDF, 251.6 KB Submission MinterEllison proposed permit conditions 31 July 2025 06/08/2026 PDF, 1.2 MB Submission MinterEllison permit plans consolidated 31 July 2025 Part 1 06/08/2026 PDF, 33.4 MB Submission MinterEllison permit plans consolidated 31 July 2025 Part 2 06/08/2026 PDF, 29.3 MB Submission Greg Lehman 3 July 2025 06/08/2026 PDF, 315.4 KB Submission MinterEllison Design integrity cases supporting draft conditions 14 July 2025 06/08/2026 PDF, 144.9 KB Submission - MinterEllison - proposed permit conditions 11 July 2025 06/08/2026 PDF, 490.1 KB Submission MinterEllison correspondence between MinterEllison Brendon Gale and Damian Gill on AFL funding package 15 July 2025 06/08/2026 PDF, 385.7 KB Submission Roland Browne Our Place closing submission 15 July 2025 06/08/2026 PDF, 908.7 KB Submission - MinterEllison - Landscape plans including names of architects and sub-consultants 14 July 2025 06/08/2026 PDF, 25.7 MB Submission - MinterEllison - Technical Note 16 - Reconciliation of Plans 14 July 2025 06/08/2026 PDF, 3.5 MB Submission - MinterEllison - Technical Note 15 - Aboriginal Community Consultation and Engagement 14 July 2025 06/08/2026 PDF, 1.1 MB Submission - MinterEllison - Technical Note 14 - Tourism Data 14 July 2025 06/08/2026 PDF, 4.1 MB Submission - MinterEllison - email on proposed permit conditions 10 July 2025 06/08/2026 PDF, 434.6 KB Submission - MinterEllison - proposed permit conditions 10 July 2025 06/08/2026 PDF, 472.2 KB Submission - MinterEllison GJM Heritage letter to MinterEllison on proposed heritage permit conditions 10 July 2025 06/08/2026 PDF, 127.5 KB Submission - MinterEllison - email with addendum to noise & vibration evidence, landscape plans authorship and response on transport modelling 10 July 2025 06/08/2026 PDF, 5.2 MB Submission - MinterEllison - Dr Neil Mackenzie - Noise and Vibration Addendum to Statement of Expert Evidence 10 July 2025 06/08/2026 PDF, 5.0 MB Submission - Roland Browne Our Place - hearing opening statement 9 July 2025 06/08/2026 PDF, 83.7 KB Submission - MinterEllison - Technical Note 13 - Emergency Management and Safety 9 July 2025 06/08/2026 PDF, 19.1 MB Submission - MinterEllison - Technical Note 12 - Power supply infrastructure 9 July 2025 06/08/2026 PDF, 153.5 KB Submission - MinterEllison - Correspondence between MinterEllison Brendon Gale and Damian Gill regarding AFL funding package 9 July 2025 06/08/2026 PDF, 318.8 KB Submission - Hobart City Council 9 July 2025 06/08/2026 PDF, 117.7 KB Submission - MinterEllison - Technical Note 11 - Site Remediation 8 July 2025 06/08/2026 PDF, 1.8 MB Submission - MinterEllison - Technical Note 10 - Landscape Plans 8 July 2025 06/08/2026 PDF, 187.9 KB Submission - MinterEllison - Technical Note 10 - Attachment 1 - Current landscape concept plans 8 July 2025 06/08/2026 PDF, 49.1 MB Submission - MinterEllison - Technical Note 9 - Precinct Car park 8 July 2025 06/08/2026 PDF, 921.1 KB Submission - Roland Browne Our Place - Timothy Biles Tim Biles Project - Addendum to hearing presentation 9 July 2025 06/08/2026 PDF, 1.1 MB Submission - Ian Terry - Hobart War Memorial paper 2002 06/08/2026 PDF, 3.4 MB Submission - Ian Terry - Cenotaph Report final January 2001 06/08/2026 PDF, 10.8 MB Submission - Ian Terry - Shrine of Remembrance July 2013 06/08/2026 PDF, 13.0 MB Submission - Dr Naomi Parry Duncan hearing presentation 8 July 2025 06/08/2026 PDF, 4.6 MB Submission - MinterEllison - Technical Note 8 - Additional operating model and capital cost information 8 July 2025 06/08/2026 PDF, 624.8 KB Submission - MinterEllison - KPMG hearing presentation 8 July 2025 06/08/2026 PDF, 1.5 MB Submission - MinterEllison - Correspondence with Brendon Gale regarding AFL funds distribution 7 July 2025 06/08/2026 PDF, 232.7 KB Submission - letter MinterEllison 7 July 2025 06/08/2026 PDF, 23.3 KB Submission - MinterEllison - Jim Gard'ner Historic Heritage Addendum to Statement of Evidence 7 July 2025 06/08/2026 PDF, 277.6 KB Submission - MinterEllison - Jim Gard'ner hearing presentation 8 July 2025 06/08/2026 PDF, 3.4 MB Submission - MinterEllison - Technical Note 7 - Northern Access Road and Bus Plaza 7 July 2025 06/08/2026 PDF, 315.8 KB Submission - MinterEllison - Technical Note 6 - Cricket specific design elements and roof design testing 7 July 2025 06/08/2026 PDF, 137.3 KB Submission - MinterEllison - Graeme Steverson WSP hearing presentation 7 July 2025 06/08/2026 PDF, 11.6 MB Submission - letter MinterEllison 3 July 2025 06/08/2026 PDF, 25.5 KB Submission - MinterEllison - Technical Note 5 - Plans Update and Clarification 3 July 2025 06/08/2026 PDF, 95.1 KB Submission - Stadiums Tasmania hearing presentation 3 July 2025 06/08/2026 PDF, 8.1 MB Submission - Jerry de Gryse 1 July 2025 06/08/2026 PDF, 184.9 KB Submission - Environment Protection Authority 1 July 2025 06/08/2026 PDF, 811.3 KB Submission - MinterEllison - Cox Architecture hearing presentation - Design Overview - Egress Diagrams June 2025 06/08/2026 PDF, 14.6 MB Submission - letter MinterEllison 1 July 2025 06/08/2026 PDF, 134.6 KB Submission - MinterEllison - Technical Note 4 - Federal Funding Agreement 1 July 2025 06/08/2026 PDF, 106.4 KB Submission - Graeme Wells - Comments on KPMG Consolidated Report 30 June 2025 06/08/2026 PDF, 103.7 KB Submission - Hobart City Council - Professor Peter Phibbs - AEC Response to Peer Review 30 June 2025 06/08/2026 PDF, 530.2 KB Submission - Visual Impact Assessment agreement between Mr Goss Orbit Solutions Mr Saul and Mr Murphy 30 June 2025 06/08/2026 PDF, 386.4 KB Submission - letter MinterEllison 30 June 2025 06/08/2026 PDF, 14.4 KB Submission - MinterEllison - Neil Shephard - Planning Statement of Evidence 29 June 2025 06/08/2026 PDF, 7.2 MB Submission - letter MinterEllison 29 June 2025 06/08/2026 PDF, 114.7 KB Submission - MinterEllison - Technical Note 3 - Precinct Plan 29 June 2025 06/08/2026 PDF, 566.6 KB Submission - Roland Browne Our Place - Barry Murphy Murphy Landscape Consultancy - Landscape Architecture Evidence hearing presentation 9 July 2025 06/08/2026 PDF, 11.8 MB Submission - Roland Browne Our Place - Timothy Biles Tim Biles Project - Report 1 Review and Conclusions and Report 2 Analysis of Renders and Montages April 2025 06/08/2026 PDF, 9.2 MB Submission - Roland Browne Our Place - Barry Murphy Murphy Landscape Consultancy - review of Orbit Solutions expert evidence 29 June 2025 06/08/2026 PDF, 4.8 MB Submission - MinterEllison - Cox Architecture hearing presentation 1 30 June 2025 07/08/2026 PDF, 70.5 MB Submission - MinterEllison - Cox Architecture hearing presentation 2 - Plaza Entry 30 June 2025 (Video) Submission - MinterEllison - Cox Architecture hearing presentation 3 - video of shadow condition - Midday 15th May 2025 (Video) Submission - MinterEllison - Cox Architecture hearing presentation 4 - Inside the Stadium 30 June 2025 Submission - Brendon Gale - Tasmania Football Club - hearing presentation 27 June 2025 06/08/2026 PDF, 7.2 MB Submission - MinterEllison - Technical Note 2 Capacity for approval 26 June 2025 06/08/2026 PDF, 5.5 MB Submission - MinterEllison - Kim Evans hearing presentation 27 June 2025 06/08/2026 PDF, 11.1 MB Submission - MinterEllison - KPMG consolidated report 26 June 2025 06/08/2026 PDF, 1.5 MB Submission - letter MinterEllison 25 June 2025 06/08/2026 PDF, 116.3 KB Submission - MinterEllison - Christopher Goss Orbit Solutions - Landscape and Visual Impact Assessment 25 June 2025 06/08/2026 PDF, 13.4 MB Submission - MinterEllison - Christopher Goss Orbit Solutions - visual amenity evidence statement photomontages 24 June 2025 07/08/2026 PDF, 77.3 MB Submission - MinterEllison - Christopher Goss Orbit Solutions - visual amenity statement of evidence 24 June 2025 06/08/2026 PDF, 1.2 MB Submission - MinterEllison - Technical Note 1 - updated capital cost estimates 24 June 2025 06/08/2026 PDF, 242.5 KB Submission - MinterEllison - correspondence between the State and Cricket Australia and Cricket Tasmania in respect of the Heads of Agreement 25 June 2025 06/08/2026 PDF, 356.4 KB Submission - MinterEllison - MinterEllison letter to Department of State Growth seeking further information on proposed Northern Access Road 24 February 2025 06/08/2026 PDF, 32.0 KB Submission - MinterEllison - Department of State Growth letter to MinterEllison providing further information on proposed Northern Access Road 7 April 2025 06/08/2026 PDF, 63.7 KB Submission - MinterEllison - Sullivans Cove Planning Review 1991 07/08/2026 PDF, 96.8 MB Submission - MinterEllison - Precinct Plan 25 June 2025 06/08/2026 PDF, 38.6 MB Submission - letter MinterEllison 24 June 2025 06/08/2026 PDF, 14.3 KB Submission - MinterEllison - general submission 24 June 2025 06/08/2026 PDF, 891.1 KB Submission - letter MinterEllison 23 June 2025 06/08/2026 PDF, 115.6 KB Submission - MinterEllison - Graeme Steverson - Transport statement of evidence 21 June 2025 06/08/2026 PDF, 593.5 KB Submission - Cricket Australia and Cricket Tasmania 20 June 2025 06/08/2026 PDF, 610.9 KB Submission - Tasmanian Symphony Orchestra 19 June 2025 06/08/2026 PDF, 128.6 KB Submission - letter MinterEllison 19 June 2025 06/08/2026 PDF, 118.1 KB Submission - MinterEllison - Dr Neil Mackenzie - Noise & Vibration statement of evidence 18 June 2025 06/08/2026 PDF, 23.0 MB Submission - MinterEllison - Jim Gard'ner - Historic Heritage statement of evidence 18 June 2025 06/08/2026 PDF, 13.5 MB Submission - Cuan Petheram 17 June 2025 06/08/2026 PDF, 240.1 KB Submission - Hobart City Council 16 June 2025 06/08/2026 PDF, 370.0 KB

Decision

17/09/2025

Commission reports to the Minister

The Panel has finalised its integrated assessment report, and a recommendation report to the Minister under section 26 of the State Policies and Projects Act 1993.

Commission letter of transmission to the Minister - 16 September 2025 PDF, 189.4 KB